📍 PM #NarendraModi will inaugurate the new integrated terminal building of #ChennaiAirport on April 8.
📍 The construction of New Integrated terminal building, T-2 (Phase -1) in an area of 1,36,295 sq.m has been completed at a cost of Rs. 1260 crore which will increase the passenger serving capacity of the airport from 23 Million Passengers Per Annum (MPPA) to 30 MPPA.
📍 The new terminal is a striking reflection of the local Tamil culture, incorporating traditional features such as the Kolam (a pattern or design drawn in front of South Indian homes), Saree, Temples, and other elements that highlight the natural surroundings.
Cre: timesofindia
651
761
0
0